Frames wil be done first, as a hardest part. it takes 4-5 moth for 20 of them to be made. So Let's say to get the frames going, $1000 down payment will work. Then another $1000 to produce the 20 slides. After the two main parts are done , and they are looking good , i will take a full down payment. If something does not work out or timelines are slipping, leery once will be able to opt out from the project without penalty.. and without an option to come back in it at the advertised price. We will make it work for everyone. Skeptics are welcome, I like the challenge. Judgmental once need not apply. ;0) |
|
![]() |
![]() |
![]() |
|
|