Quote:
Originally Posted by Edward Tinker
I would be leery about sending 1/2 down and a 2 year wait on a possible project.
Make one first and show people it exists.
No offense, but you have negative feedback on this forum and Jan Still's forum for being unresponsive and slow in turn around.
Ed
|
I think for the leery once we can arrange something like that:
Frames wil be done first, as a hardest part. it takes 4-5 moth for 20 of them to be made. So Let's say to get the frames going, $1000 down payment will work.
Then another $1000 to produce the 20 slides.
After the two main parts are done , and they are looking good , i will take a full down payment.
If something does not work out or timelines are slipping, leery once will be able to opt out from the project without penalty.. and without an option to come back in it at the advertised price.
We will make it work for everyone. Skeptics are welcome, I like the challenge. Judgmental once need not apply. ;0)