LugerForum Discussion Forums my profile | register | faq | search
upload photo | donate | calendar

Go Back   LugerForum Discussion Forums > Luger Discussion Forums > All P-08 Military Lugers

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-23-2005, 04:12 PM   #2
Vlim
Moderator
Lifetime
LugerForum Patron
 
Vlim's Avatar
 
Join Date: Oct 2002
Location: Europe
Posts: 5,053
Thanks: 1,036
Thanked 3,991 Times in 1,205 Posts
Default

Hi,

Well, Mauser was only one of thousands of contractors and subcontractors. With that amount of suppliers involved it makes sense to camoflage where they are located and what they are doing. A good example is the DWM site at Lubeck-Schlutup, which was disguised so well that it was invisible from the air and was never bombed. Would they have printed 'DWM Lubeck-Schlutup' all over the side or bottom of the product, it would give too much information away.

Another example: Mauser was not working from one site, but from 3 seperate sites in Oberndorf and one in Berlin during the 1930s.

The whole enterprise was to make it difficult for the outside world to interpret who did what, where and in what numbers while at the same time making it easier to interpret exactly the same thing within Germany.

It would be interesting to see period allied reports on German rearming and arms facilities, though. Just to get a feeling about what was exactly known about German facilities in general.
Vlim is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:50 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Copyright © 1998 - 2026, Lugerforum.com