Hello to all, well, it's been awhile since my last report, but I'm happy to say, that other than revisions taking a LOT more time,...
![]() ![]() ![]() So, here it is! Drum cover (actual operations needed, Rev. 02 – 21 – 2016 ) 1) Unpack, disassemble, inspect, number three key parts (Not applicable after first 50 units)………………………………. COMPLETED 2) Degrease & weld (shut), re-radius, re-polish internal radius, COMPLETED 3) Relocate & recut, (mill) magazine catch .080” lower (1.100”) min. COMPLETED 4) Grind / trim / reduce / polish feed lip level with rear feed lip length COMPLETED 5) Re-size for fit in press die (to light friction or drop free function) COMPLETED 6) Cut & Polish out transitional catch traps, 4 total, BIT, 320, 500, COMPLETED 7) Re-shape hold open teardrop (Ream to 1/4” OAD .020” approx..) COMPLETED 8) Flare tear drop bottom rad. loader function, break feedlip edges COMPLETED 9) Stamp GT…………………………………………………………............ COMPLETED 10) Re-finish black oxide …………..…………………………………….. COMPLETED Pivot axle / sweep arm & washer 1) Trim lever end to .230” +/- .005”, proper tightening of the lever…... COMPLETED 2) Countersink holes on shaft ends for seating of end screws…… … COMPLETED 3) Check clearance for catch pin (.025”)………………..…………….……COMPLETED 4) Weld sweep arm and washer ………………………………………….…COMPLETED 5) (re-finish black oxide if needed) ………………………......................... COMPLETED Spring cup cover plate assembly 1) Discard spr., torq. to 240 in. lbs. test cup weld, anchor stud ………COMPLETED 2) Adjust internal guide plate / radius / bend vertical edge IN PROGRESS 3) Refinish black oxide ( if required on spring cup)………………. ONLY IF NEEDED 4) Fabricate & Install new replacement main spring GTHQ IN PROGRESS 5) Reassemble, pivot axle, cover, sweep arm, preload 10 lbs?+ 7) Add .025” spacer washer under sweep arm & secure with retainer pin 8) Reinstall modified winding lever with pan head screw Follower & coil spring 1) Disassemble and install new spring endplate .030” X .390” X .925” 2) Retain all with new cleat .030” X .145” X .900” 3) Install follower stop preset to 33/35 degrees from vertical spring 4) Polish all bearing surfaces, and trim follower pad to: 1.030” OAL 5) Install .250”/.270” Delrin spacer floor plate for greater preload at transition point Reassembly, bench test & lube 1) lube spring with either white grease with moly, or DuPont lube with Teflon 2) Install follower & spring / cross bolt and drum cover pan head screw 2) load using loader aid device and test for 32 round feed 3) tag as complete There you have it!!! ![]() Last edited by G.T.; 03-08-2016 at 07:42 PM. |
![]() |
![]() |
The following 10 members says Thank You to G.T. for your post: |
|
|