View Single Post
Unread 09-20-2002, 06:33 PM   #3
LP08
User
 
Join Date: Aug 2002
Location: Colorado
Posts: 71
Thanks: 0
Thanked 0 Times in 0 Posts
Post

The first three are inspection stamps, perhaps three different inspectors at the plant but definitely at three different production stages. The fourth is a final acceptance stamp--same stamp as appears on the barrel and is a test proof. None of the stamps in the photo are proofs, by the way. All four are inspection approval stamps. That is my understanding.
LP08 is offline   Reply With Quote